ORDER VALUE | DISCOUNT | COUPON CODE |
---|---|---|
Rs 10,000/- TO Rs 49,999/- | 5% | TLK5 |
Rs 50,000/- TO Rs 74,999/- | 7.5% | TLK7.5 |
Rs75,000/- TO Rs 99,999/- | 10% | TLK10 |
Above Rs 1,00,000/- | 12% | TLK12/REQUEST QUOTE |
NOTE: Above schemes are available on a purchase of single order only. In case of multiple order within a time frame of 30 days, cashback will be remitted to your account.Â
₹3,580 Original price was: ₹3,580.₹2,489Current price is: ₹2,489. Inc. GST
10 in stock
Powder coated grey finish 2*10 watt up down exterior Wall Light powered by CREE LED and high quality driver with yellow light.
Weight | 0.6 kg |
---|---|
Warranty | 1 Year |
Construction | Aluminium Die Cast |
Colour Finish | Grey |
Length(mm) | 95 |
Width(mm) | 70 |
Height(mm) | 110 |
Number of Lamps | 2 |
Lamp Type | LED CREE |
Max Wattage (W) | 10W |
Total Wattage (W) | 20W |
Lamp Included | Yes |
Transformer Details | Top quality LED driver |
IP RATING | IP65 |
Color Temperature | 3000K |
CRI | 80 |
Beam Angle | 36 Degree |
Product Weight(kg) | 0.4 |
Our order processing team processes all the orders once daily at 8:00 am in the morning. So, all orders booked after 8:00 am in the morning will be processed the next working day at 8 am and so on. Once we have your order our processing team will start processing your order dispatch them within three working after your processing has started. Once dispatched the tracking details will be available on our website. We usually dispatch by the top most courier services by surface mode available for that pin code. In general courier's take maximum of 7 to 10 days even to the remote locations.
Regions | Transit Time |
---|---|
EXCLUDING ORDER HANDLING AND PROCESSING TIME (3 WORKING DAYS) |
|
Haryana, Delhi, Punjab, Uttar Pradesh, Himachal Pradesh, Chandigarh, Uttarakhand, Jammu & Kashmir, Rajasthan | 4-10 Days |
Sikkim, Assam, Meghalaya, Arunachal Pradesh, Mizoram, Tripura, Nagaland | 4-10 Days |
Goa, Dadra & Nagar Haveli, Gujarat, Maharashtra, Daman & Diu | 4-10 Days |
Madhya Pradesh, Chattisgarh, Jharkhand | 4-10 Days |
West Bengal, Odisha, Bihar | 4-10 Days |
Andaman & Nicobar Islands | 7-10 Days |
Lakshadweep | 7-10 Days |
Manipur | 7-10 Days |
Reviews
There are no reviews yet