ORDER VALUE | DISCOUNT | COUPON CODE |
---|---|---|
Rs 10,000/- TO Rs 49,999/- | 5% | TLK5 |
Rs 50,000/- TO Rs 74,999/- | 7.5% | TLK7.5 |
Rs75,000/- TO Rs 99,999/- | 10% | TLK10 |
Above Rs 1,00,000/- | 12% | TLK12/REQUEST QUOTE |
NOTE: Above schemes are available on a purchase of single order only. In case of multiple order within a time frame of 30 days, cashback will be remitted to your account.Â
₹2,601 Original price was: ₹2,601.₹1,471Current price is: ₹1,471. Inc. GST
Ultra modern, premium, mild steel silver (chrome – wood) finish, heavy square crystal glass single spot light. Great for installation above a dressing mirror, dressing table, to provide illumination while applying make-up. It can also be used as a wall light, spot light, bed side light, picture light. It is comes with an G4 holder and inbuilt transformer. Matching two light code – ML305-2. Matching three light code – ML305-3, Matching four light code – ML305-4, Matching five light code – ML305-5. LAMP INCLUDED.
>
6 in stock
SKU | ML305-1 |
---|---|
Width/diameter (mm) | 120 |
Depth/Projection (mm) | 140 |
Height (mm) | 75 |
Shade Width (mm) | 70 |
Shade Height (mm) | 50 |
Construction | Mild Steel |
Color Finish | Dark Wood |
Lamp Type | G4 |
Number of Lamps | 1 |
Max Wattage (W) | 20W |
Total Wattage (W) | 20W |
Lamp Included | YES |
Transformer Details | Inbuilt |
Weight (Kg) | 0.7 kg |
Weight | 0.7 kg |
---|
Our order processing team processes all the orders once daily at 8:00 am in the morning. So, all orders booked after 8:00 am in the morning will be processed the next working day at 8 am and so on. Once we have your order our processing team will start processing your order dispatch them within three working after your processing has started. Once dispatched the tracking details will be available on our website. We usually dispatch by the top most courier services by surface mode available for that pin code. In general courier's take maximum of 7 to 10 days even to the remote locations.
Regions | Transit Time |
---|---|
EXCLUDING ORDER HANDLING AND PROCESSING TIME (3 WORKING DAYS) |
|
Haryana, Delhi, Punjab, Uttar Pradesh, Himachal Pradesh, Chandigarh, Uttarakhand, Jammu & Kashmir, Rajasthan | 4-10 Days |
Sikkim, Assam, Meghalaya, Arunachal Pradesh, Mizoram, Tripura, Nagaland | 4-10 Days |
Goa, Dadra & Nagar Haveli, Gujarat, Maharashtra, Daman & Diu | 4-10 Days |
Madhya Pradesh, Chattisgarh, Jharkhand | 4-10 Days |
West Bengal, Odisha, Bihar | 4-10 Days |
Andaman & Nicobar Islands | 7-10 Days |
Lakshadweep | 7-10 Days |
Manipur | 7-10 Days |
Reviews
There are no reviews yet